Flared connection (Union)
Flared connection
(Service valve, Ball valve)
Use a seemliness tube
Factory charged
Indoor
Outdoor
REFRIGERANT PIPING
INSTALLATION OF OUT DOOR UNIT
Perform the work according to the Service
Manual or Installation Guide.
Select a location that satisfies the following
conditions. Install the unit firmly in place.
Select the following location
A place where the air conditioner can
get good ventilation.
A place where it shall not annoy the
neighbors.
A place where the unit shall be leveled
and that can support the weight of unit
and withstand its vibrations.
Keep a maintenance space
Above 70Cm
Above 30Cm
Outdoor unit
mC05 evobAmC03 evobA
Face of wall
• Use two spanners when connect the
refrigerant pipe to the unit.
• Make a bend with a radius as large as
possible.
• After completing the piping connection,
execute vacuum drying for the connecting
piping and the indoor unit.
• The vacuum drying must be carried out
using the service ports of both the liquid
and gas side valves.
• When piping work is finished, check all
joints.
Add refrigerant if piping is over 7.5m.
Capacity Addition volume
18K BTU/h 15 g/m
24K BTU/h 25 g/m
30K BTU/h 35 g/m
36K BTU/h 30 g/m
42K BTU/h 30 g/m
48K BTU/h 45 g/m
60K BTU/h 75 g/m